KYTC Logo
US 60 in both directions: Paving operations.
US 60 in both directions: Paving operations.
Between Crossfield Drive and KY 2865. The road is being repaved. The roadway is reduced to one lane. The left lane is blocked. From 8:00AM EDT to 4:30PM EDT daily. Until October 7.
Last updated on July 20