KYTC Logo
Highways
KY 4 No Reports
KY 9 1 Report
KY 10 No Reports
KY 11 2 Reports
KY 15 2 Reports
KY 15S No Reports
KY 21 No Reports
US 23 1 Report
US 23S No Reports
I-24 2 Reports
US 25 1 Report
US 25E 1 Report
US 25W No Reports
US 27 No Reports
KY 30 No Reports
US 31 No Reports
US 31E No Reports
US 31W 3 Reports
KY 32 No Reports
KY 34 No Reports
US 41 1 Report
US 41A No Reports
US 42 4 Reports
US 45 No Reports
US 51 No Reports
KY 55 1 Report
KY 56 No Reports
US 60 2 Reports
US 60B 1 Report
KY 61 2 Reports
US 62 1 Report
US 62X No Reports
I-64 5 Reports
I-65 6 Reports
US 68 1 Report
US 68B No Reports
US 68X No Reports
KY 70 No Reports
I-71 2 Reports
I-75 2 Reports
KY 79 No Reports
US 79 No Reports
KY 80 No Reports
KY 80B No Reports
KY 90 No Reports
KY 101 No Reports
KY 114 No Reports
KY 118 No Reports
US 119 No Reports
US 127 4 Reports
US 127B No Reports
US 150 No Reports
US 150B No Reports
KY 151 No Reports
KY 180 No Reports
KY 191 No Reports
KY 205 No Reports
US 231 No Reports
KY 259 No Reports
I-264 No Reports
I-265 No Reports
I-275 1 Report
KY 402 No Reports
KY 418 No Reports
US 421 2 Reports
KY 425 No Reports
US 431 No Reports
KY 446 No Reports
US 460 No Reports
KY 461 No Reports
I-471 1 Report
KY 471 No Reports
KY 555 No Reports
KY 627 No Reports
US 641 No Reports
US 641S No Reports
KY 645 No Reports
KY 686 No Reports
KY 841 No Reports
KY 914 No Reports
KY 922 No Reports
KY 3041 No Reports
Audubon Parkway No Reports
Bluegrass Parkway 1 Report
Cumberland Parkway No Reports
Daniel Boone Parkway No Reports
Mountain Parkway 1 Report
Mountain Parkway Extension No Reports
Pennyrile Parkway 2 Reports
Purchase Parkway No Reports
Western Kentucky Parkway No Reports
William Natcher Parkway 1 Report
Road Reports—Statewide
Map of Statewide Between Mile Point 12 in Bell County and Mile Point 14 in Bell County. The roadway is reduced to one lane. The right lane is blocked. Traffic signal maintenance work is in progress. From 7:00AM EDT to 5:00PM EDT on Mondays, Tuesdays, Wednesdays and Thursdays. Until October 20. Between Christian, Hopkins County Line and Mile Point 30 in Hopkins County. The roadway is reduced to one lane. Bridge construction work is in progress. There is a width limit in effect. Truck restrictions are in force. Look out for flaggers. Width limit 9'6". Until Sunday, at about 11:59PM EDT. Between KY 11 KY 15 and Mile Point 34 in Powell County. The roadway is reduced to one lane. Bridge construction work is in progress. Expect delays. There is a width limit in effect. Width limit 12'0". Clearing this week. Between Exit 45: KY 293 and Trigg, Christian County Line. Road maintenance work is in progress. A lane is closed. Expect delays. Speed restrictions are in force. There is a width limit in effect. Width limit 12'0". Speed limit 55 MPH. Until December 1. Between Nugent Lane and Powers Lane. The roadway is reduced to one lane because of road maintenance activities. Expect delays. Until December 15. Between Old Main Street and Harper Cemetery Road. Bridge construction work is in progress. Construction traffic may be merging. For the next five months. Between Campbell, Pendleton County Line and KY 1997. Road maintenance work is in progress. A lane is blocked. Expect delays. Until October 17. Between Mile Point 58 in Hart County and Mile Point 66 in Hart County. Major road construction work is in progress. The shoulder is closed. For a long period. Between Mile Point 28 in Henry County and Henry, Trimble County Line. Road construction work is in progress. The road is being repaved. A lane is blocked. Traffic is heavy. Expect long delays. Speed restrictions are in force. Fines are double in the work zone. The ramp is blocked. There is a width limit in effect. Speed limit 55 MPH. Width limit 13'0". Until October 31. Between I-265 and KY 1631; Fern Valley Road. Road construction work is in progress. A lane is closed. Expect delays. From 7:00PM EDT to 5:00AM EDT daily. For a long period. Between Allison Avenue and Richardson Road. The road is blocked. Bridge construction work is in progress. A detour is in operation. Until October 24. Between Exit 112: KY 245 and Mile Point 118 in Bullitt County. The roadway is reduced to two lanes because the road is being repaved. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 30. Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24. Between Mile Point 64 in Woodford County and Mile Point 74 in Fayette County. The road is being repaved. A lane is closed. Speed restrictions are in force. Expect delays of uncertain duration. Until October 14. Between KY 1725 and Rail Street. The roadway is reduced to one lane. Look out for long term road construction work. For a long period. Between Brook Street; Muhammad Ali Boulevard and John F Kennedy Bridge. Look out for long term road construction work. The roadway is reduced to two lanes. Expect delays. From 9:00PM EDT to 5:00AM EDT on Fridays and Saturdays. Clearing this week. Between Bickel Avenue and Spring Street; Adams Street. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Expect delays. Speed limit 25 MPH. Until October 31. Between Anderson, Franklin County Line and US 60; US 60. A lane is closed. Expect delays because the road is being repaved. Until November 30. Between Washington, Anderson County Line and Mile Point 54 in Mercer County. The road is being repaved. The left lane is blocked. Until October 15. Between KY 2171; Hubert Reid Road and KY 70; KY 70; East Center Street; West Center Street. The roadway is reduced to one lane because of construction work. The road is open for local access only. Until tomorrow at about 11:59PM EDT. Between Mile Point 20 in Oldham County and Mile Point 22 in Oldham County. Bridge construction work is in progress. Expect changing traffic patterns. A lane is blocked. Speed restrictions are in force. Fines are double in the work zone. Expect delays. Speed limit 60 MPH. Until September 30, 2015. Between KY 420 and KY 2261. The roadway is reduced to one lane because the road is being repaved. Speed restrictions are in force. Observe the signs. Expect changing traffic patterns. Speed limit 25 MPH. For the next three weeks. Between Exit 86: US 41A and Tennessee State Line. Road maintenance work is in progress. The left lane is blocked. Expect delays. Until October 15. Between Tennessee State Line and Butt Road. Major road construction work is in progress. Expect single line traffic alternating directions. Look out for flaggers. Expect delays. Speed restrictions are in force. Until November 15. Between Crossfield Drive and KY 2865. The road is being repaved. The roadway is reduced to one lane. The left lane is blocked. From 8:00AM EDT to 4:30PM EDT daily. Until October 7. Between Mile Point 58 in Rockcastle County and Mile Point 68 in Rockcastle County. Road maintenance work is in progress. A lane is closed. Expect delays. Until November 30. Between US 62 and Mile Point 74 in Fayette County. The left lane is blocked. Major road construction work is in progress. The road is being repaved. For the next two months. Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period. Between Mile Point 122 in Bath County and Mile Point 130 in Rowan County. The roadway is reduced to one lane. There is a width limit in effect. Speed restrictions are in force. Fines are double in the work zone. Speed limit 55 MPH. Width limit 12'0". Until October 31. Between KY 1017; Turfway Road and Price Avenue. There are alternating lane closures due to water main work. Until November 30.
US 25E southbound: Roadway reduced to one lane, right lane blocked, traffic signal maintenance work.
I-275 in both directions: Bridge maintenance operations, alternating lane closures.
US 42 in both directions: Road construction, roadway reduced to one lane, ramp partially blocked, new road layout.
Pennyrile Parkway in both directions: Roadway reduced to one lane, bridge construction, width limit in effect, truck restrictions in force, look out for flaggers.
I-471 in both directions: Bridge maintenance operations, alternating lane closures.
Mountain Parkway westbound: Roadway reduced to one lane, bridge construction, delays, width limit in effect.
I-24 in both directions: Road maintenance operations, lane closed, delays, speed restrictions in force, width limit in effect.
US 60 in both directions: Roadway reduced to one lane, because of road maintenance activities, delays.
US 31W in both directions: Bridge construction, construction traffic merging.
KY 9 in both directions: Road maintenance operations, lane blocked, delays.
US 68 in both directions: Bridge construction, lane blocked.
I-65 in both directions: Major road construction, shoulder closed.
I-71 southbound: Road construction, paving operations, lane blocked, heavy traffic, long delays, speed restrictions in force, fines are double in the work zone, ramp blocked, width limit in effect.
KY 61 in both directions: Road construction, lane closed, delays.
US 42 westbound: Roadway reduced to one lane, road maintenance operations, delays, consider using an alternate route.
US 60B in both directions: Road construction, roadway reduced to one lane, changing traffic patterns, delays.
I-64 eastbound: Accident.
I-75 in both directions: Bridge maintenance operations, alternating lane closures.
US 127 in both directions: Road construction, changing traffic patterns, on ramps, follow the signs, a mandatory speed limit is in force.
KY 11 in both directions: Road blocked, bridge construction, detour in operation.
I-65 in both directions: Roadway reduced to two lanes, because the road is being repaved, width limit in effect.
I-65 in both directions: Long term road construction, delays, slow moving maintenance vehicle, changing traffic patterns, width limit in effect.
I-64 in both directions: Paving operations, lane closed, speed restrictions in force, delays of uncertain duration.
US 23 northbound: Roadway reduced to one lane, long term road construction.
I-65: Road construction, roadway reduced to two lanes, changing traffic patterns.
I-65 northbound: Long term road construction, roadway reduced to two lanes, delays.
KY 11 in both directions: Bridge construction, changing traffic patterns, reduce your speed.
US 42: Bridge construction, roadway reduced to one lane, speed restrictions in force, delays.
KY 15 in both directions: Bridge maintenance operations, roadway reduced to one lane, single line traffic - alternating directions, temporary traffic lights, truck detour in operation.
US 421 in both directions: Road construction, lane blocked, delays.
US 127 in both directions: Road construction, bridge construction, speed restrictions in force, lane blocked.
US 127 in both directions: Lane closed, delays, because the road is being repaved.
Bluegrass Parkway in both directions: Paving operations, left lane blocked.
US 41 in both directions: Roadway reduced to one lane, because of construction work, open for local access only.
US 31W in both directions: Bridge maintenance operations, lane blocked, delays.
US 62 in both directions: Major road construction, delays of uncertain duration, look out for flaggers.
US 42 eastbound: Road maintenance operations, roadway reduced to one lane, delays, consider using an alternate route, ramp restrictions in force.
I-71 southbound: Bridge construction, changing traffic patterns, lane blocked, speed restrictions in force, fines are double in the work zone, delays.
Pennyrile Parkway in both directions: Road construction, roadway reduced to one lane, right lane blocked, ramp blocked, delays.
I-64 eastbound: Exit ramp closed, because of construction work.
US 127 in both directions: Roadway reduced to one lane, because the road is being repaved, speed restrictions in force, observe signs, changing traffic patterns.
I-24 in both directions: Road maintenance operations, left lane blocked, delays.
KY 55 in both directions: Roadway reduced to one lane, road construction, look out for flaggers, delays.
I-65 southbound: Construction work, right lane closed.
US 421 in both directions: Bridge construction, lane blocked.
US 31W in both directions: Major road construction, single line traffic - alternating directions, look out for flaggers, delays, speed restrictions in force.
US 60 in both directions: Paving operations, roadway reduced to one lane, left lane blocked.
William Natcher Parkway northbound: Bridge maintenance operations, width limit in effect.
I-75 in both directions: Road maintenance operations, lane closed, delays.
I-64 eastbound: Left lane blocked, major road construction, paving operations.
KY 61 in both directions: Road construction, lane blocked.
I-64 in both directions: Roadway reduced to one lane, width limit in effect, speed restrictions in force, fines are double in the work zone.
US 25 southbound: Alternating lane closures, due to water main work.
KY 15 in both directions: Bridge maintenance operations, roadway reduced to one lane, temporary traffic lights, width limit in effect, delays.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info