KYTC Logo
Menu
Road Reports Road Reports
Restrictions Restrictions
Cameras Cameras
Cookies must be enabled to view certain features on this website.
Road Reports—Statewide
Map of Statewide Between US 60; Versailles Road and US 421; Leestown Road. Look out for construction work. A mandatory speed limit is in force. A detour is not available. Blasting is in progress. Advisory speed limit 45 MPH. Width limit 11'0". From 8:00PM EST to 7:00AM EST on Fridays and from 7:00PM EST to 7:00AM EST on weekends, Mondays, Tuesdays, Wednesdays and Thursdays. Between Mile Point 98 in Fayette County and Mile Point 100 in Fayette County. Look out for construction work. Look out for brush control operations. A lane is closed intermittently. From 7:30AM EST to 6:00PM EST on weekdays. Until March 31. Between Mile Point 152 in Grant County and Grant, Kenton County Line. Look out for long term road construction work. Drive carefully. Until May 29. Between Maple Spring Drive and I-265. A lane is blocked. Road construction work is in progress. From 7:00PM EST to 5:00AM EST on weekdays. For the next three weeks. Between Mile Point 20 in Oldham County and Mile Point 22 in Oldham County. Bridge construction work is in progress. Expect changing traffic patterns. A lane is blocked. Speed restrictions are in force. Fines are double in the work zone. Expect delays. Speed limit 60 MPH. Until September 30. Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period. Between Mile Point 10 in Mercer County and Mercer, Jessamine County Line. There are alternating lane closures. Look out for brush control operations. Look out for flaggers. From 8:00AM EST to 5:00PM EST on weekdays. Between Mile Point 24 in Daviess County and Daviess, Hancock County Line. The roadway is reduced to one lane. The road is being repaved. Road construction work is in progress. Observe the signs. Look out for temporary traffic lights. Look out for flaggers. Speed limit 45 MPH. Until August 1. Between Mile Point 8 in Laurel County and Mile Point 14 in Clay County. Look out for construction work. Look out for brush control operations. Speed restrictions are in force. Speed limit 45 MPH. Until April 30. Between Exit 5B: 3rd Street and I-65. The roadway is reduced to one lane. The road is being repaved. From 9:00PM EST to 5:00AM EST on Tuesday, Wednesday, Thursday and Friday. Until today at about 11:59PM EST. Between I-65 and Exit 7: US 42; Story Avenue. The roadway is reduced to one lane. The road is being repaved. Between KY 331; Industrial Park Road and Pleasant Valley Road. A lane is closed intermittently. Look out for construction work. Until October 15, 2016. Between Old Main Street and Harper Cemetery Road. Bridge construction work is in progress. Construction traffic may be merging. For a long period. Between Mile Point 58 in Hart County and Mile Point 82 in Hardin County. Look out for long term road construction work. For a long period.
KY 4 in both directions: Construction work, a mandatory speed limit is in force, no detour available, blasting.
US 431 in both directions: Construction work, alternating lane closures, look out for flaggers.
I-65: Road construction, roadway reduced to two lanes, changing traffic patterns.
I-64 eastbound: Exit ramp closed, because of construction work.
I-75 southbound: Construction work, brush control, intermittent lane closure.
Pennyrile Parkway in both directions: Long term road construction, roadway reduced to one lane, stop and go traffic.
I-75 in both directions: Long term road construction, drive carefully.
US 421 in both directions: Road construction, roadway reduced to one lane, delays.
KY 61 in both directions: Lane blocked, road construction.
US 62 in both directions: Major road construction, delays of uncertain duration, look out for flaggers.
I-71 southbound: Bridge construction, changing traffic patterns, lane blocked, speed restrictions in force, fines are double in the work zone, delays.
KY 61 in both directions: Road construction, lane blocked.
US 68 in both directions: Alternating lane closures, brush control, look out for flaggers.
US 60: Roadway reduced to one lane, paving operations, road construction, observe signs, temporary traffic lights, look out for flaggers.
Daniel Boone Parkway in both directions: Construction work, brush control, speed restrictions in force.
I-64 eastbound: Roadway reduced to one lane, paving operations.
US 42 westbound: Entrance ramp closed, construction work.
I-64 westbound: Roadway reduced to one lane, paving operations.
US 60 in both directions: Intermittent lane closure, construction work.
Mountain Parkway Extension in both directions: Major road construction, blasting, traffic is being held. Expect delays.
I-71 southbound: Right lane closed, because of bridge maintenance work.
US 31W in both directions: Bridge construction, construction traffic merging.
I-65 in both directions: Long term road construction.
I-65 northbound: Exit ramp closed, because of major road construction work.
KY 30 in both directions: Bridge construction, roadway reduced to one lane, temporary traffic lights.
Google Static Map Image
Closure Closure Restriction Restriction Crash Crash Warning Warning Info Info