KYTC Logo
Named Roads with Cameras
Bowling Green
  KY 231 1 Camera
Fort Campbell
  KY911 1 Camera

other
  Downtown 6 Cameras
  Morgantown 1 Camera
  Scottsville 1 Camera
Cameras—Statewide
Map of Statewide Between Old Main Street and Harper Cemetery Road. Bridge construction work is in progress. Construction traffic may be merging. For a long period. Between Mile Point 28 in Metcalfe County and Mile Point 32 in Metcalfe County. Bridge construction work is in progress. A lane is blocked. For the next five months. Between Henry, Trimble County Line and Trimble, Carroll County Line. Road maintenance work is in progress. Bridge maintenance work is in progress. A lane is blocked. Expect delays. Speed restrictions are in force. Speed limit 55 MPH. Until September 30. Between Mile Point 58 in Hart County and Mile Point 66 in Hart County. Major road construction work is in progress. The shoulder is closed. For a long period. Between Mile Point 28 in Henry County and Henry, Trimble County Line. Road construction work is in progress. The road is being repaved. A lane is blocked. Traffic is heavy. Expect long delays. Speed restrictions are in force. Fines are double in the work zone. The ramp is blocked. Speed limit 55 MPH. Until October 31. Between R Glover Road and KY 839. Road construction work is in progress. Expect changing traffic patterns. Speed restrictions are in force. For the next three weeks. Between Exit 9: KY 1865; Taylor Boulevard and Exit 10: KY 1020; Southern Parkway. Road maintenance work is in progress. There is work on the shoulder. For the next three weeks. Between Mile Point 96 in Madison County and Mile Point 106 in Fayette County. Road construction work is in progress. The roadway is reduced to two lanes. Expect changing traffic patterns. Speed restrictions are in force. Expect delays. Speed limit 55 MPH. Until July 31. Between Mile Point 4 in Woodford County and US 60X. The road is being repaved. The roadway is reduced to one lane. Expect delays. Consider using an alternate route. Until Thursday, at about 11:59PM EDT. Between KY 7; Lynn; Southshore Road and Ohio State Line. Road construction work is in progress. A lane is closed. Look out for flaggers. Speed restrictions are in force. Fines are double in the work zone. Until August 31. Between Allison Avenue and Richardson Road. The road is blocked. Bridge construction work is in progress. A detour is in operation. Until September 30. Between Exit 102: KY 313; Joe Prather Highway and Mile Point 112 in Bullitt County. Look out for long term road construction work. Expect delays. Look out for a slow moving maintenance vehicle. Expect changing traffic patterns. There is a width limit in effect. Speed limit 55 MPH. Width limit 16'0". Until November 24. Between 5th Street and Cane Run Road. The road is being repaved. The roadway is reduced to one lane. Observe the signs. From 7:00PM EDT to 6:00AM EDT daily. Until September 1. Between KY 914; KY 914 and KY 80; KY 80. The road is being repaved. A lane is closed. Expect delays. Consider using an alternate route. Until October 15. Between Mile Point 112 in Montgomery County and Mile Point 118 in Bath County. The right lane is blocked. Look out for construction work. Until July 31. Between Campbell, Pendleton County Line and KY 1997. The road is being repaved. A lane is blocked. Expect delays. From 7:00AM EDT to 7:00PM EDT on weekdays. Until August 4. Between KY 1428 and KY 3384 Town Branch Road. The roadway is reduced to one lane because the road is being repaved. Expect delays. Clearing this week. Between Mile Point 74 in Henderson County and Mile Point 76 in Henderson County. The roadway is reduced to one lane. The left lane is blocked. For the next half day. Between US 231; US 231 and KY 1543. Bridge construction work is in progress. The road is closed. A detour is in operation. Until August 1. Between Holts Creek Road and Bracken, Pendleton County Line. The road is being repaved. A lane is blocked. Expect single line traffic alternating directions. Look out for flaggers. Until August 4. Between Bickel Avenue and Spring Street; Adams Street. Bridge construction work is in progress. The roadway is reduced to one lane. Speed restrictions are in force. Expect delays. Speed limit 25 MPH. Until October 31. Between US 45X; 8th Street and Illinois State Line. The bridge is closed due to road construction work. A detour is in operation. Follow the signs. Expect delays. Until July 29. Between Mile Point 8 in Butler County and Mile Point 12 in Butler County. Road construction work is in progress. A lane is blocked. Consider using an alternate route. Expect delays. Speed limit 35 MPH. From 7:00AM EDT to 5:00PM EDT on weekdays. For the next three weeks. Between Washington, Anderson County Line and Mile Point 54 in Mercer County. The road is being repaved. The left lane is blocked. Until October 15. Between KY 488 and KY 1305. The road is blocked because of bridge maintenance work. A detour is in operation. From 8:00AM EDT to 8:00PM EDT on Monday, Tuesday, Wednesday and Thursday. Until Thursday, at about 8:00PM EDT. Between Mile Point 52 in Barren County and Mile Point 60 in Hart County. Look out for a slow moving maintenance vehicle. The road is closed intermittently. Traffic is slow because of blasting work. Expect delays. From 11:00AM EDT to 5:00PM EDT on weekdays. For the next three weeks. Between Mile Point 20 in Oldham County and Mile Point 22 in Oldham County. Bridge construction work is in progress. Expect changing traffic patterns. A lane is blocked. Speed restrictions are in force. Fines are double in the work zone. Expect delays. Speed limit 60 MPH. Until September 30, 2015. Between Hopkins, Muhlenberg County Line and KY 189. The road is being repaved. A lane is blocked. Expect single line traffic alternating directions. For the next week. Between KY 420 and KY 2261. The roadway is reduced to one lane because the road is being repaved. Speed restrictions are in force. Observe the signs. Speed limit 25 MPH. For the next month. Between Mile Point 28 in Shelby County and KY 2861; Zaring Mill Road. Road construction work is in progress. The road is being repaved. A lane is blocked. Expect delays. From 10:00PM EDT to 5:00AM EDT on Saturdays and from 7:00PM EDT to 5:00AM EDT on weekdays and Sundays. For the next three weeks. Between Tennessee State Line and Butt Road. Major road construction work is in progress. Expect single line traffic alternating directions. Look out for flaggers. Expect delays. Speed restrictions are in force. Until November 15. Between Crossfield Drive and KY 2865. The road is being repaved. The roadway is reduced to one lane. The left lane is blocked. From 8:00AM EDT to 4:30PM EDT daily. Until October 7. Between I-64; I 64 and Goose Creek Road. The road is closed to traffic because of road maintenance activities. The road is open for local access only. A detour is in operation. Until August 1. Between Hill Brook Drive and KY 1526; John Harper Road. Road construction work is in progress. A lane is blocked. For a long period. Between Gardner Lane and Speed Avenue. Road maintenance work is in progress. A lane is blocked. From 8:30AM EDT to 3:30PM EDT on weekdays. For the next three weeks.
Downtown: Downtown Louisville @ Brook & Jefferson
Downtown: Downtown Louisville @ 2nd & Market
Downtown: Downtown Louisville @ Brook & Broadway
KY911: KY911 DMS Camera
Downtown: Downtown Louisville @ 2nd & Main
KY 231: KY 231 @ Natcher Pkwy
Morgantown: Morgantown Rd @ Campbell Ln
Downtown: Downtown Louisville @ 9th & Market
Downtown: Downtown Louisville @ 2nd & Broadway
Scottsville: Scottsville Rd @ Lovers Ln
Google Static Map Image
Camera Camera